Conceptual, Pre-feasibility, Feasibility study for 200 MW floating and ground-mounted solar power plant at Barapukuria coal mine in Dinajpur district.
Started on
January 01, 1970
RINA Consulting S.P.A
(a International organization)
Brief of the project
- Topographical Survey
- Route Survey
- Geophysical Survey (Side Scanner)
- Geotechnical Survey
- Water Sample Collection and Lab Test
- CBR Test
- Soil Resistivity Test
- Water Electric Resistivity Test
- Hydrology Assessment
- Seismic Reflection Study for Onshore Subsoil Features
- Feasibility Study
- ESIA
- Subsoil Features
Project Budget
0.00