Project Details
Conceptual, Pre-feasibility, Feasibility study for 200 MW floating and ground-mounted solar power plant at Barapukuria coal mine in Dinajpur district.
Started on January 01, 1970
RINA Consulting S.P.A
(a International organization)
Brief of the project
- Topographical Survey - Route Survey - Geophysical Survey (Side Scanner) - Geotechnical Survey - Water Sample Collection and Lab Test - CBR Test - Soil Resistivity Test - Water Electric Resistivity Test - Hydrology Assessment - Seismic Reflection Study for Onshore Subsoil Features - Feasibility Study - ESIA - Subsoil Features
Project Budget
taka
0.00