4 River Re-Excavation Project, Sirajganj to Gaibandha-217 km. Under 24 Engineering Construction Brigade, Bangladesh Army, Dhaka Cantonment, Dhaka.
Started on
January 01, 1970
24 ECB Bangladesh Army
(a Government organization)
Brief of the project
- RL Fly from SoB Reference point to site
- Aerial Survey
- Topographic Survey
- Bathymetric Survey
- Pre Work
- Post Work
- Volume Calculation
- Reporting
Project Budget
0.00